Commit Graph

6 Commits

Author SHA1 Message Date
Bane Stojkovic 35bf22edea test sync 2026-11-06 09:29:50 +01:00
Bane Stojkovic caac843741 Regenerate regression references from current master
The previous references were produced by 4.34 (2022) and no longer matched any project: netlist
pin names and the switch-setup header have changed since. PNGs and both netlist variants were
regenerated with PREPARE; netlists were deleted first, because PREPARE only writes a netlist
that does not exist yet.
2026-10-14 12:30:07 +02:00
Bane Stojkovic 0e5dad5412 Sync tests 2022-11-24 22:28:19 +01:00
Bane Stojkovic 4d88fb36cb Update regression files 2022-10-30 10:10:25 +01:00
Bane Stojkovic c30c8da267 Add rotary switches 2022-10-22 18:44:49 +02:00
Bane Stojkovic dbfb768dc3 Create report for each regression run 2022-03-03 16:40:50 +01:00